Estimasi Pengembangan Perangkat Lunak Dengan Use Case Size Point

  • Puguh Jayadi * Mail Universitas PGRI Madiun, Indonesia
  • Juwari Universitas PGRI Madiun, Indonesia
  • Muh.Nur Luthfi Azis Universitas PGRI Madiun, Indonesia
  • Kelik Sussolaikah Universitas PGRI Madiun, Indonesia

Abstract

In software development activities one of the stages that need to be known by the project manager and the client is the estimated effort. The estimation activity is used as a reference in determining the time and personnel involved in software development. There are several methods used in software estimation such as Function Point, COCOMO, and Use Case Point. However, there are still some shortcomings such as the subjective tendency to measure complexity and lack of calculation on technical factors and environmental factors. The estimation used in this study uses the Use Case Size Point method which is the development of the Use Case Point method. The results of the Use Case size Point were used to provide a more accurate evaluation of effort with 0.01 Mean Magnitude of Relative Error (MMRE) and 0.01 Mean Magnitude of Relative Error (MMER)

References

W. W. Agresti, W. M. Evanco, and W. M. Thomas, “Models for Improving Software System Size Estimates during Development,” J. Softw. Eng. Appl., vol. 03, no. 01, pp. 1–10, 2010.

A. Y. P. Putri, “Modifikasi Metode Function Point Dengan Menambahkan Kompleksitas Proses Bisnis Pada General System Characteristics Untuk Estimasi Biaya Perangkat Lunak,” Institut Teknologi Sepuluh Nopember, 2018.

A. Kaushik, P. Kaur, N. Choudhary, and Priyanka, “Stacking regularization in analogy-based software effort estimation,” Soft Comput., vol. 26, no. 3, pp. 1197–1216, 2022.

F. Ristanti, A. Dwi Herlambang, and M. C. Saputra, “Evaluasi Biaya Pengembangan Perangkat Lunak Dengan Menggunakan Metode Extended Use Case Point Dan Use Case Size Point,” 2018.

N. Marcheta, “Effort Estimation Modeling Of E-Government Application Development Using Function Points Based On TOR And SRS Document,” J. Inf. Technol. Its Util., vol. 3, no. 1, p. 5, 2020.

M. R. Barroek and D. E. Hadinata, “Proses Inferensi Dinamis Pada Software Effort Estimation Menggunakan Case Based Reasoning,” J. Komput. Terap., vol. 3, no. 2, pp. 77–94, 2017.

S. Sariyanti, “Pengembangan Kakas Estimasi Perangkat Lunak Dengan Function Point Dan Use Case Point Untuk Praktikum Rekayasa Perangkat Lunak,” J. Sarj. Tek. Inform., vol. 6, no. 2, pp. 1–9, 2018.

S. Sariyanti and Ardiansyah, “Kakas Estimasi Perangkat Lunak Menggunakan Function Point dan Use Case Point untuk Praktikum Rekayasa Perangkat Lunak di Universitas Ahmad Dahlan,” Annu. Res. Semin., vol. 3, no. 1, 2017.

L. Indriyani, “Perbandingan Metode Cocomo II Dan Metode Analogy Untuk Estimasi Effort Pengembangan Software,” J. Tek. Komput. AMIK BSI, vol. 6, no. 2, pp. 174–180, 2020.

O. S. Fatonah and Y. Afrizal, “Model Estimasi Biaya Perangkat Lunak Menggunakan COCOMO II (Studi Kasus Pt. X),” Informatika, pp. 1–7, 2016.

M. C. Saputra et al., “Perbandingan Antara Metode Advance Use Case Point Dan Revised Use Case Point Untuk Evaluasi Biaya Pengembangan Sistem Informasi Reservasi Ruangan,” Jurnan Tek. Inform. Dan Sist. Inform., vol. 7, no. 1, 2020.

G. Karner, “Resource estimation for objectory projects,” Object. Syst. SF AB, pp. 1–9, 1993.

M. Hariyanto et al., “Estimasi Proyek Pengembangan Perangkat Lunak Dengan Fuzzy Use Case Points,” J. Softw. Eng., vol. 1, no. 1, pp. 54–63, 2015.

M. Hariyanto and R. S. Wahono, “Estimasi Proyek Pengembangan Perangkat Lunak Dengan Fuzzy Use Case Points,” J. Softw. Eng., vol. 1, no. 1, pp. 54–63, 2015.

M. R. Braz and S. R. Vergilio, “Software Effort Estimation Based on Use Cases,” in Proceedings - International Computer Software and Applications Conference, 2006, vol. 1, pp. 221–228.

M. Azzeh, A. B. Nassif, and I. B. Attili, “Predicting Software Effort from Use Case Points: A Systematic Review Reputation Systems View project Capturing Emirati-Accented Speech Corpora for Applications of Speech Signal Processing View project Predicting Software Effort from Use Case Points: A Sys,” Sci. Comput. Program., vol. 204, 2021.

V. Van Hai, H. L. T. K. Nhung, Z. Prokopova, R. Silhavy, and P. Silhavy, “Toward Improving the Efficiency of Software Development Effort Estimation via Clustering Analysis,” IEEE Access, vol. 10, no. June, pp. 83249–83264, 2022.

S. A. Butt, S. Misra, G. Piñeres-Espitia, P. Ariza-Colpas, and M. M. Sharma, “A Cost Estimating Method for Agile Software Development,” in Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 2021, vol. 12955 LNCS, pp. 231–245.

Dimensions Badge
Published
2022-12-26
How to Cite
Jayadi, P., Juwari, Muh.Nur Luthfi Azis, & Sussolaikah, K. (2022). Estimasi Pengembangan Perangkat Lunak Dengan Use Case Size Point . Bulletin of Information Technology (BIT), 3(4), 332 - 340. https://doi.org/10.47065/bit.v3i4.408
Section
Articles